SPAU 140 C
Synchro-check relay
The relay incorporates two identical stages
which operate as independent units. Both stages
of the synchro-check relay has two parallel func
tions: a synchro-check function and a voltage
check function.
The synchro-check relay can be used for two
different operating conditions, the most typical
of which is where both sides of the circuit
breaker to be closed are live. Then synchronism
is always checked before the circuit breaker is
given the permission to close. The other situa
tion is where one or both sides of the circuit
breaker to be closed are dead and, consequently,
frequency and phase difference cannot be meas
ured. In this case the relay checks the energiz
ing direction. The user is able to define the volt
age range within which the measured voltage is
determined to be "live" and "dead".
The purpose of the synchro-check function is
to find the instant when the voltages on both
sides of the circuit breaker are in synchronism.
The conditions for synchronism are met when
the voltages on both sides of the circuit breaker
have the same frequency, are in phase and are of
such a magnitude that the concerned busbars
or lines can be regarded as live.
When the frequency, phase angle and voltage
conditions are fulfilled, the duration of the syn
chronizing conditions is checked so as to en
sure that they will still be met when the con
tacts of the circuit breaker close. This duration
is determined on the basis of the frequency and
phase difference measured. Depending on the
circuit breaker and the closing system, the de
lay from the moment the closing signal is given
until the circuit breaker finally closes is about
50 - 250 ms. The CB operate time selected tells
the relay for how long, at least, the conditions
have to persist.
The voltage-check function checks the energiz
ing direction. Energizing is defined as the situ
ation where a dead network part is connected
to an energized section of the network. The con
ditions of the network sections to be controlled
by the circuit breaker, i.e. which side has to be
live and which side dead, are determined by set
ting. A situation where both sides are dead is
possible as well.
When the energizing direction corresponds to
the settings, the situation has to be constant for
a certain time before the close signal is permit
ted. The purpose of this operate time (dead time)
is to make sure that the dead side remains
deenergized and that the situation is not due to
a temporary interference. Should the conditions
not persist for the specified operate time, the
operate time is reset and the procedure is started
again when allowed by the conditions. Not un
til the required energizing situation has been
constant throughout the set operate time, cir
cuit-breaker closing is permitted
Measured voltage U1. rated voltage 100 V
Measured voltage U1. rated voltage 110 V
Measured voltage U2. rated voltage 100 V
Measured voltage U2. rated voltage 110 V
Measured voltage U3. rated voltage 100 V
Measured voltage U3. rated voltage 110 V
The relay is able to measure either phase-to-phase voltages or phase-to-neutral
voltages, but phase-to-phase voltages are preferred.
Stage 1 of the synchro-check relay can be blocked by applying an external auxiliary
voltage level blocking signal BS to terminals 10-11. The blocking function is se
lected with switch 1 of switchgroup SGB in the main menu of the relay. The
blocking function is not activated in the default setting of the relay.
Stage 2 of the synchro-check relay can be blocked by applying an external auxiliary
voltage level blocking signal BS to terminals 22-23. The blocking function is se
lected with switch 2 of switchgroup SGB in the main menu of the relay. The
blocking function is not activated in the default setting of the relay.
When command mode operation has been selected for stage 1. the stage is acti
vated for CB closing by an auxiliary voltage level control signal CS13. applied to
the terminals 45-46. If continuous mode operation has been selected no control
signal need be applied to the relay. Switch 3 of switchgroup SGB is used for select
ing the desired mode of operation. Default setting of stage 1: continuous mode
operation.
When command mode operation has been selected for stage 2. the stage is acti
vated for CB closing by an auxiliary voltage level control signal CS23. applied to
the terminals 47-48. If continuous mode operation has been selected no control
signal need be applied to the relay. Switch 4 of switchgroup SGB is used for select
ing the desired mode of operation. Default setting of stage 2: continuous mode
operation.
At command mode operation the alarm signal for failed circuit breaker closing
(NC13 and NC23) and for CB close request signals that have remained activated
(CSF13 and CSF23) is received via output relay A at command mode operation.
The switches 1. 3. 5 and 7 of switchgroup SGR are used for the configuration of
the alarm signals. No alarm signals are received at continuo