AMAT 0010-11239 PVD High-Voltage Power Interface Assembly
AMAT 0010-11239 PVD High-Voltage Power Interface Assembly
Introduction
The AMAT 0010-11239 is a specialized high-voltage power interface component engineered by Applied Materials.
It is primarily designed for the Endura and Centura PVD (Physical Vapor Deposition) platforms.
This assembly acts as a critical link in the electrical delivery chain, managing the distribution of power to the cathode or electrostatic chuck (E-Chuck) assemblies.
Its robust construction ensures that high-voltage signals are transmitted with minimal loss while maintaining strict isolation within the vacuum-adjacent environment of the chamber.
Technical Parameter Table
| Attribute | Specification |
| Manufacturer | Applied Materials (AMAT) |
| Model Number | 0010-11239 |
| Component Type | High-Voltage Interface / Power Distribution |
| Application | PVD (Physical Vapor Deposition) |
| Platform Compatibility | Endura 5500, Centura |
| Voltage Rating | High-Voltage (HV) Compatible |
| Weight | 0.85 kg (approx. 1.87 lbs) |
| Material | High-Dielectric Ceramics & Specialized Alloys |
| Vacuum Rating | High Vacuum Compatible |
| Mounting Type | Chassis/Feedthrough Integrated |
Unique Product Description
The AMAT 0010-11239 is defined by its superior dielectric strength and thermal resilience.
In the demanding environment of a PVD chamber, where high-energy plasma is constant, this interface prevents electrical arcing and insulation breakdown.
It is precision-machined to provide a secure, low-resistance connection that ensures the stability of the deposition process.
By maintaining exact voltage levels for the target or substrate,
the 0010-11239 directly contributes to the uniformity of the thin films being deposited on the silicon wafer, making it an indispensable part for high-yield semiconductor manufacturing.
Product Advantages and Features
Arc Suppression: Built with specialized insulation materials to prevent high-voltage discharge in vacuum conditions.
Enhanced Thermal Stability: Designed to operate reliably under the heat loads generated during prolonged metal deposition cycles.
Precision Conductivity: High-purity alloy contacts ensure minimal voltage drops, maintaining process consistency.
OEM Reliability: Engineered specifically for AMAT hardware, ensuring perfect fitment and eliminating the risk of system-mismatch errors.
Cleanroom Ready: Shipped and packaged to meet stringent semiconductor industry cleanliness standards.
Related Models
AMAT 0010-11240: Complementary HV cable assembly.
AMAT 0190-00101: Substrate heater power interface.
AMAT 0010-20011: E-Chuck power supply module.
AMAT 0010-76001: PVD Cathode assembly interface.
Other Models in the Same Series
The 0010-11xxx series includes various electrical and mechanical interface modules for AMAT mainframes:
0010-11238: Low-voltage signal interface variant.
0010-11245: Multi-pin feedthrough assembly.
0010-11500: Heavy-duty power distribution block.
Application Cases
Metal Deposition (PVD): Used in Endura systems for Aluminum (Al) or Copper (Cu) sputtering where high-voltage stability is required for the cathode.
Electrostatic Chuck (ESC) Control: Provides the necessary electrical interface for substrate clamping and temperature control.
Refurbished Tool Upgrades: A standard replacement part for upgrading 200mm fabrication tools to ensure compliance with modern electrical safety standards.
Installation and Maintenance
| YOKOGAWA | SR1030B62 |
| YOKOGAWA | SR1030B62-3MN*1C |
| YOKOGAWA | SCP451-11 |
| YOKOGAWA | PW482-10 |
| Yokogawa | KS2-5*A |
| Yokogawa | KS8-5*A |
| Yokogawa | KS9-5*A |
| YOKOGAWA | YS1700-100/A06/A31 |
| YUN/云环 | 10A |
| ZIPPE | MWS10/A |
| ZNYX | ZX370 SERIES |
| ZUNKU | 6201-2RS |
| ZUNKU | 6203-2RS |
| ZYCOM | IGLACS01281 |
| ZYGO | ZMI-2002 8020-0211-1-J |
| ZYGO | 8010-0105-01 |
| ZYGO | PC200 CS1115-801-346 |
| ZYGO | ZMI-4004 |
| ZYGO | 7702 8070-0102-01X |
| ZYGO | 7702 8070-0102-35 |
| ZYGO | ZMI-2002 8020-0211 |
Installation:
Safety First: Ensure the system is fully de-energized and all capacitors are safely discharged before handling.
Contamination Control: Handle the unit only with cleanroom-approved gloves to prevent surface contamination that could lead to electrical leakage.
Torque Specs: Ensure all electrical connections are tightened to the specified torque to prevent localized heating from high resistance.
Maintenance:
Visual Inspection: During quarterly PM (Preventative Maintenance), check for signs of "carbon tracking" or discoloration on the insulation.
Testing: Perform a dielectric withstand test (Hi-Pot test) if the system reports leakage current errors.
Cleaning: Use only approved electronic-grade cleaning agents that leave no residue.
| User name | Member Level | Quantity | Specification | Purchase Date |
|---|