easYgen-3500XT-P2-K58 8440-2318
External breaker logic is enabled via configuration of parameter
3411 Ä p. 217 to "EXTERNAL".
All breaker control (especially the CB closing instructions) must be
carried out via master controller (e.g. a PLC).
The easYgen controller always issues additionally the breaker
open command under fault conditions and in the breaker unloading
states (Unloading GCB) if the stop request is active.
STOP MANUAL AUTOMATIC
The GCB is opened; the MCB is operated
depending on the setting of "Enable MCB"
(parameter 12923 Ä p. 228/Ä p. 907).
Mains parallel operation can be initiated by
pressing the "GCB On" or "MCB On" push
button.
The GCB is synchronized via an add-on
request and a mains parallel operation is
performed. When a shed-off request is
issued, the generator sheds load and
opens the GCB and the engine is shut
down following the configured cool down
period.
Emergency power: The emergency power
operation is terminated following the expi
ration of the mains settling time. The MCB
is synchronized and closed, putting the
system back into a mains parallel opera
tion.
OPEN TRANSIT.: Breaker logic "Open transition / change-over / brake-before-make"
The MCB and GCB are never synchronized in this breaker logic mode.
The GCB is opened; the MCB is operated
depending on the setting of "Enable MCB"
(parameter 12923 Ä p. 228/Ä p. 907).
A change can be made to either generator
or mains operation by pressing either the
"GCB On" or "MCB On" push-button. The
"STOP" push-button opens the GCB and
simultaneously stops the engine.
A change is made to generator operation
through an add-on request. Once the add
on request is terminated, the system
changes back to mains operation. The
MCB is closed when the busbar is dead,
even if there has not been an add-on
request. Emergency power operations are
terminated following the expiration of the
mains settling timer. The GCB opens and
the MCB closes, transferring all loads to
the mains.
CLOSED TRANSIT.: Breaker logic "Closed transition / make-before-brake / overlap synchronization"
The MCB and the GCB are synchronized, in order to avoid a dead busbar in this breaker logic mode. Immediately after the synchroni
zation of one breaker, the other is opened. Continuous mains parallel operation is not possible.
The GCB is opened; the MCB is operated
depending on the setting of "Enable MCB"
(parameter 12923 Ä p. 228/Ä p. 907).
Synchronization of either the generator or
the mains can be initiated by pressing the
"GCB On" or "MCB On" push-button.
The GCB is synchronized via an add-on
request. After the GCB closes the MCB is
opened. Following the shed-off request
being issued, the MCB is synchronized
and closed. After the MCB has closed the
GCB is opened.
Emergency power: The emergency power
operation is terminated following the expi
ration of the mains settling time and the
MCB synchronizing to the generator. The
MCB closes and the GCB opens immedi
ately afterwards.
INTERCHANGE: Breaker logic "Soft loading / interchange synchronization"
The MCB and the GCB are synchronized, in order to avoid a dead busbar in this breaker logic mode. The operation of a breaker
under load is avoided by utilizing the ability to soft load. Continuous mains parallel operation is not possible with this breaker logic.
Following the shed-off request, the MCB synchronizes and closes, the generator soft unloads to the mains and the GCB opens. After
the GCB is open the engine is stopped following the expiration of the configured cool down period.
The GCB is opened; the MCB is operated
depending on the setting of "Enable MCB"
(parameter 12923 Ä p. 228/Ä p. 907).
Synchronization of either the generator or
the mains can be initiated by pressing the
"GCB On" or "MCB On" push-button.
Via an engine request, the GCB is
| ABB | PFCL201C 20KN 3BSE023409R20 |
| ABB | PFCL201CE 10KN 3BSX105983-100 |
| ABB | 3BHE046836R0102 GFD563A102 |
| ABB | PVD164A2059 3BHE014340R2059 |
| ABB | UNS4684A-P,V.1 HIEE305114R00R0001 |
| ABB | PFRL101C-1.0KN 3BSE023316R1002 |
| ABB | SUE3000 1VCF750090R0804 |
| ABB | DSAO110 57120001-AT/1 |
| ABB | DSAO120 57120001-EY |
| ABB | REF542 |
| ABB | 7625013-S |
| ABB | 500TTM02 1MB150021R01161HF930712X010 |
| ABB | 500CMP04 HE401314/0001 1MRB150051R1 |
| ABB | 500CSP04 HE401314/0002 1MRB150051R2 |
| ABB | 500PB101 1MRB178009R0001 1MRB200064/C |
| ABB | 500CPU03 1HDF700003R5122 |
| ABB | 500TRM02 1MRB150011R0001 |
| ABB | 500TRM02 1MRB150011R1 |
| ABB | 500SCM01 1MRB150004R0001 1MRB200059/C |
| ABB | 500SCM01 1MRE450004R1 |
synchronized and the generator power is
increased. The MCB is then opened. Fol
lowing the disabling of the engine request,
the MCB is reverse synchronized and the
GCB is then opened.
Emergency power: The emergency power
operation is terminated following the expi
ration of the mains settling time. The MCB
closes, the load is transferred, and the
GCB opens.
STOP MANUAL AUTOMATIC
PARALLEL: Breaker logic "Mains parallel"
This operation mode may be used both in the case of an islanded system, an islanded parallel system, and a system that is operated
in mains parallel.
The GCB is opened. Mains parallel operation can be performed
via the "GCB On" push-button.
The GCB is synchronized via an add-on
request and mains parallel operation is
performed.
When a shed-off request is issued, the
generator sheds load, the GCB is opened,
and the engine is shut down following the
configured cool down period
STOP MANUAL AUTOMATIC
PARALLEL: Breaker logic "Mains parallel"
This operation mode may be used both in the case of an islanded system, an islanded parallel system, and a system that is operated
in mains parallel.
The GCB is opened. Mains parallel operation can be performed
via the "GCB On" push-button.
The GCB is synchronized via an add-on