Westinghouse Control Systems Westinghouse Control Systems
● Westinghouse uses Ovation
® Distributed Control
System as highly reliable platform for non-safety
cont l f ti i PWR BWR & VVER trol functions in PWRs, BWRs
& VVER
s
– Eliminate plant trips
– Reduce or eliminate critical path time
– Eliminate single-point vulnerability
– Eliminate hardware calibration time
– Provide advanced diagnostics down to point level
– U t d d d t ll i &h d Use s
tan
dar
d an
d proven con
trol logic
&
har
dware
configurations
– Reduce operator burden and challenges
– Common interface across control systems Common interface across control systems
applications and platform
– Advanced platform that supports the latest
technolo
gies and common desi
gns with AP1000
Ovation
® Well Suited For Nuclear Well Suited For Nuclear
• Designed for the power industry with Nuclear attributes
• I t t Pl t O t Si l ti S l ti In
tegra
tes Plan
t
Opera
tor Simulation
S
olution
• Integrates System Security Model
S
y yp stem functions defined b
y roles & res
ponsibilities
User actions defined down to point level
• Alarm System
Eight alarm levels (four high & four low) Eight alarm levels (four high
& four low)
Alarm cutout
Modal alarming based on plant conditions
• Controller Application Software is in a Drawing Sheet
format using SAMA symbols
• Scalable & Integrated Cyber security solution
3
Scalable
& Integrated Cyber security solution
Ovation
® Applications in Nuclear
Control Applications
(
Analo
g/Pneumatic/Di
gital
)
Ovation
® Applications in Nuclear
pp
( g g)
NSSS Controls – Advanced Feedwater Control, Pressurizer
Level & Pressure, Chemical Volume Control Systems, Rx
Temperature, Steam Dump, Rod Control Demand, Reactor
Water Level, Reactor Recirculation, Reactor Pressure
BOP Controls BOP Controls
– Moisture Separator Re Moisture Separator Re
-heater Heater drains heater, Heater drains,
Drain tanks, Waste Processing, Sampling Systems, etc.
Main Turbine and Feed Pum
p control &
p y rotection s
ystems
including electro hydraulics
Vibration Monitoring System (CSI-6500 or Bently Nevada)
Ovation
® Applications in Nuclear (cont)
Control Applications
(Analog/Pneumatic/Digital cont
)
Ovation
® Applications in Nuclear (cont)
Control Applications
(Analog/Pneumatic/Digital cont
)
Rod Control Logic Comtrol
Rod Position Indication System Rod Position Indication System
Bus technologies (Profibus and Foundation Fieldbus)
Wireless Technologies – monitoring applications
Flux Mapping Systems and Traverse Incore
Generator Monitoring and Protection
Automatic Voltage Regulator – Alterrex, WTA
Ovation
® Applications in Nuclear (cont)
Information System Applications
Sft P t Di l S t (SPDS)
Ovation
® Applications in Nuclear (cont)
S
a
f
e
t
y
Parame
t
e
r Display
Sys
tems (SPDS)
Smart Alarm systems (Westinghouse Product)
Plant Computer systems including Nuclear Application Programs Plant Computer systems including Nuclear Application Programs
Plant Simulators
Stimulated Solutions
– hardware based
Simulated Solutions – manually coded application software
Emulated Solutions – automatically generated software running
on virtual machines
Westinghouse Ovation Westinghouse Ovation
® Projects
U.S. Plants
● AP1000™- Vo
gtle 3&4, VC Summer 2&3
(In Process MCR, SIM, all non-safety including FWCS )
● Duke Energy – Catawba 1&2 (NSSS/FWCS, SIM)
● Duke Energy – McGuire 1&2 (NSSS/ FWCS, FPCS, MTS,SIM)
● Exelon
– Byron 1&2; Braidwood 1&2 (TCPS TGTMS MSR MTS SIM) Byron 1&2; Braidwood 1&2 (TCPS, TGTMS, MSR, MTS, SIM)
● Exelon – Clinton (RWLCS, SIM) in process
● FP&L – St. Lucie (TCPS, SIM)
● Hope Creek (SPDS, SIM)
● P i t B h (PCS SIM) P
oin
t
Beac
h (PCS, SIM)
● SCE – San Onofre 2&3 (TCS, FWCS, FPCPS, CVCS, SIM)
● South Texas 1&2 (PCS, AS, SIM)
● South Texas 3&4 ABWR ( ) In Process; MCR, All BOP )
● Surry 1&2 (PCS, SIM)
● SNC – Farley 1&2 (In Process, TCPS, MSR, SIM)
● SNC – Vogtle 1&2 (FWCS, SIM) delivered – not installed
● Wolf Creek
- (In Process TCPS FPCPS BOP MTS SIM)
8
Wolf Creek
- (In Process, TCPS, FPCPS, BOP, MTS, SIM)
Westinghouse Ovation Westinghouse Ovation
® Projects
Foreign Plants
● AP1000™**
– China 4 Units China
4 Units (In process; (In process; Haiyang Haiyang 1&2, Sanmen 1&2 MCR 1&2, MCR,
all non-safety, including FWCS, SIM)
● Almaraz 1&2 – Spain (TCS,NSSS/FWCS, FP, BOP, MTS, SIM) PCS in Process
● Angra – Brazil (AVR) FWCS in process
● Asco1&2
– Spain (LEFM) PCS, NSSS/FWCS & TCPS in process:
● Kozloduy 5&6 – Bulgaria (NSSS/FWCS, BOP, TCPS, PCS, SIM)
● Koeberg 1&2 – South Africa (PCS, SIM)
● Krsko
– Slovenia Slovenia (TCPS SIM (TCPS, SIM)
● Leningrad 3&4 RBMK; PCS
● Ringhals 2 – Sweden (MCR, all non-safety including FWCS, SIM)
●
Q sa in
s
h
a
n 3&4
–
C a hin
a ( CS) T
● Shin Kori 1&2 – Korea (MCR, NSSS/FWCS, BOP, SIM)
● Shin Kori 3&4** – Korea (MCR, all non-safety including FWCS, SIM)
● Shin Wolsong 1&2** – Korea (MCR, all non-safety including FWCS, SIM)
9
● South Ukraine Unit 3&4
– Ukraine (PCS, SIM)
Westinghouse Ovation Westinghouse Ovation